Fields marked (*) are required

1.0 Purchaser of equipment

(*) must be filled in



2.0 Site Address (if unadopted road, enclose details).

(*) must be filled in
(*) must be filled in
(*) must be filled in

3.0 System Category TICK APPROPRIATE BOX
(*) at least 1 box MUST be ticked

M
L1
L4
P1
L2
L5
P2
L3
Not Known

4.0 Commission (*) 1 must be selected
New
Additional
Alterations

5.0 Sales order information
Your order No:
(*) must be filled in
Date:
(*) must be selected
Protec Sales No:
(*) must be filled in
Additional Equipment: Yes No
(*) must be selected
Your order No:

Date:

Protec Sales No:

6.0 Equipment to be commissioned
(*) 1st line must be filled in

Model No
Description
QTY

(*)















 

7.0 Commissioning request
Your order No:
(*) must be filled in

A COPY OF THE OFFICIAL ORDER WILL BE REQUIRED PRIOR TO THE COMMISSIONING DATE

Cost
Commissioning of system will normally be changed at 'engineers' current rate and expenses.
Unless a figure has been previously quoted.
If previously quoted please insert cost:
When quotation is given it is subject to all terms and conditions being adhered to (see terms overleaf) and the information given on this form being accurate. If this is not completed, then at our sole discretion, we reserve the right to charge on a time and expenses basis.
Normally we will allow a total allowance of 30 minutes waiting time on site for breach of terms to be rectified before implementing the above.
Date requested
Please enter the date when commissioning is required: (*) must be selected
(*) must be selected
Please enter number of days commissioning required:
(*) must be selected
Note - A minimum 14 days notice is required for commission

9.0 Maintenance requirement

With reference to BS5839-1:2002 section 45 it is essential that the above commissioned fire equipment is subject to periodic maintenance. The fire precaution (workplace) regulations 1997 regulation 6, also refers to maintenance as necessary to the safety of employees in case of fire.

For a free quotation, please contact our customer services on:-

(01282) 717171 or complete the section below this form.

10.0 Maintenance quotation details

Contact Name:
Client:
Address Details:


Contact number:

8.0 Minimum requirments for system commissioning to BS5839: 2002

All documentation to be provided to our commissioning department prior to commission.

Yes

Our electrician will be on site
Design Certificate
Installation Certificate
Ladders and Scaffolding are available
Has voltage been connected to any of the equipment
The system meets BS7671
Cabling has been tested to Section 38
Equipment has been connected as requested:
Equipment is securely fixed
Cause & Effects specification returned with this form
"As fitted drawings" available for engineer
Zone details returned with this form
Text listing available on disk or returned to Protec
System specification available to our engineer
All of the listed equipment is on site
The system is wired in (cable type):

 

Name: (*) must be filled in
Capacity:
(*) must be filled in
Contact Number:
(*) must be filled in
Email:
(*) must be filled in